hydraulic engineering

Power Plant Embach-Lend, Feasibility-Study

Project Description:
The project for the hydroelectric power plant Lend - Dienten - Embach originated in 1983, however it was never implemented as a full expansion. The Salzburg AG reopened the project for reevaluating the possibility of a hydroelectric power plant. Considering current framework conditions, such as quality objective regulations for surface water, specific current construction costs, etc., a  feasibility study for expanding the water power utilization of the currently dormant potentials in the areas of  Embach was commissioned to WERNER CONSULT

Client: Salzburg AG, Special Projects Department
Timeframe: 2010
Project Share WERNER CONSULT:
Feasibility Study and Investigation of Variants