hydraulic engineering

Sewage System Aigen, Salzburg

Project Description:
The drainage area to be improved includes a total length of 36,755 m, primarily combined sewer systems, 3 precipitation overflow structures in the accumulation pool of the Water Preservation Association and/or the Salzach as a pre-flooder. Based on the present documentation, addressing population density, supplemental drainage values, canal cadaster information will be entered and designed in a hydrodynamic canal-network-calculation program. Hydraulic improvement measures will be designed to improve the critical string sections. The complete project will be submitted to the authorities for approval.

Client:
Magistrat der Stadt Salzburg (Magistrate, City of Salzburg)
Timeframe: 2012 - ongoing
Project Share WERNER CONSULT:
Condition assessment, hydro dynamic canal network calculation, permit application project, restoration concept