Structural engineering

Austria Campus, 1020 Vienna

Project Description:
The Austria Campus will be built on the property of the former north train station on an area of approx. 52.000 m², an innovative project for the UniCredit Group Austria conceptualized based on ecological sustainable criteria with a gross floor area of approx. 200,000 square meters. Divided into five construction areas, the property will feature office buildings, infrastructural units, such as an event center/art hall, restaurants, kindergartens, commercial areas for daily goods, a hotel with approx. 200 rooms, as well as a concisely defined courtyard/plaza and a low traffic boulevard.

The plans for the lower levels are 2 underground parking garages with a capacity of approx. 1,000 parking spaces. The access is primarily granted via the "Tabor", as well as entrances from the direction of Lassallestraße. The project borders on the "Praterstern" on the eastside and is connected to the public transportation system via metro-lines U1 and U2 as well as the speed train station.

Client: Buchstein Immobilienverwaltung (Real Estate Management Company)GmbH und Co OG (a 100% subsidiary of UniCredit Bank Austria AG)
Timeframe: 2013 - 2017
Gross floor space above  ground: approx. 200,000 m²
Gross floor space below  ground: rd. 100.000 m²
Project Share WERNER CONSULT: Project Management, construction site coordination pursuant of BauKG (Construction Coordination Act).