Project Description:
Newly constructed AHS (General Secondary School) with 36 classrooms. Clearing the construction area and relocation installations prior to construction begin.
The school includes laboratories, workshops, a kitchen, 3 individual gymnasiums as well as an outdoor sports facility in accordance with the ÖISS-guidelines and a library.
Awarding individual assignments/contracts.
Client: BIG Bundesimmobiliengesellschaft
Timeframe: 2008 - 2010
Construction Term: 2009 -2010
Architecture: Atelier Heiss Architekten
Project Share WERNER CONSULT: Local site supervision incl. HKLSE (heating, ventilation, air-conditioning and sanitary services) construction coordination pursuant of the BauKG (Construction Coordination Act)
Project Description:
New construction of an air cargo center and the handling facility at the Vienna airport to manage increasing freight operation. Relocating an inventory collection facility on the construction site. Extensive new construction and new design of exterior facilities. Integrating the warehouse into the new construction project while maintaining warehousing operation.
Client: VIE Flughafen Wien AG
Timeframe: 2004 - 2006
Architecture: Treusch Architecture ZT GmbH
Project Share WERNER CONSULT: Supporting control
Project Description:
Renovating the Vienna West train station location between Felberstraße and Mariahilferstraße creating the BahnhofCity Wien West. Restoration and technical adaption of the railway concourse, which is under monument protection, and constructing an additional lower level. Developing the subway-network with a single story base floor, which serves as a shopping center. Re-design the train station courtyard. New construction of two six-story office- and hotel buildings.
Client: ÖBB Infrastruktur Bau AG
Timeframe: 2008 - 2012
Architecture: Neumann + Steiner
Project Share WERNER CONSULT: Local site supervision including heating, ventilation, air-conditioning and sanitary services.
Project Description:
Revitalization of existing Check-In 1. Expansion and static upgrade of the departure level drive-through area in front of the terminal building. New construction of a conveyor belt building for the adapted and expanded baggage system (subsequent Check-In 3 operation) between Check-In 1 and the baggage logistic center (BLC). All of the construction work was conducted while maintaining ongoing airport operation.
Client: VIE Airport Vienna
Timeframe: 2007 - 2012
Project Share WERNER CONSULT: Project management
Project Description:
Office building with two below ground floors (underground parking garage with 277 parking spaces, as well as a computer center with approx. 500 m² [sqm]) and nine upper level floors. Two-story lobby on the 1st floor. In addition to office space, several special functions on the upper level floors (meeting rooms, cafeteria, travel agency, shops). Clearing the construction site including relocation the installations located on the construction site. Bridge connection to the neighboring office park 1 on the first upper level floor.
Client: VIE Flughafen Wien AG
Timeframe: 2005 - 2008
Architecture: Holzbauer & Partner Ziviltechniker GesmbH
Project Share WERNER CONSULT: Local site supervision, construction site coordination pursuant of the BauKG (Construction Coordination Act)