Road construction

S 36 Murtal Schnellstraße (speedway), Section St. Georgen - Scheifling

Project Description:
Within the framework of the S36 Murtal Schnellstraße (speedway) road construction project the gap between Judenburg and Scheifling in the section between St. Georgen o. J. Up to Scheifling was built during the first phase.

Client:
ASFiNAG Bau Management GmbH
Timeframe: 2007 - 2011
Construction Term: 2013 - 2019
Project Share WERNER CONSULT in ARGE:
Construction project (road planning, drainage, legal procedures)