Project Description:
The Southern segment of A 5, Nordautobahn (expressway North) from S 1 at Eibesbrunn to Schrick represents the first section of the expressway connection to Czech.
Client: Government of Lower Austria
Timeframe: 2001 - 2006
Construction Term: 2005 - 2009
Project Share WERNER CONSULT:
Studies (routing, rest areas)
permit application project (road panning, project control, tunnel, UVE, legal procedures UVP)
Construction project (project control)