Project Description:
Within the framework of the S36 Murtal Schnellstraße (speedway) road construction project the gap between Judenburg and Scheifling in the section between St. Georgen o. J. Up to Scheifling was built during the first phase.
Client: ASFiNAG Bau Management GmbH
Timeframe: 2007 - 2011
Construction Term: 2013 - 2019
Project Share WERNER CONSULT in ARGE:
Construction project (road planning, drainage, legal procedures)
Project Description:
The most Northern section of A 5, Nordautobahn (expressway North) before the state border to Czech represents the final segment of the expressway connection from Vienna to the North.
Client: ASFiNAG Bau Management GmbH / Government of Lower Austria (Government of Lower Austria)
Timeframe: 2004 - 2005
Construction Term: pending
Project Share WERNER CONSULT:
Permit application project (road panning, project control, preparing UVE concept, constitution UVE, legal procedures, UVP)
Project Description:
The Southern segment of A 5, Nordautobahn (expressway North) from S 1 at Eibesbrunn to Schrick represents the first section of the expressway connection to Czech.
Client: Government of Lower Austria
Timeframe: 2001 - 2006
Construction Term: 2005 - 2009
Project Share WERNER CONSULT:
Studies (routing, rest areas)
permit application project (road panning, project control, tunnel, UVE, legal procedures UVP)
Construction project (project control)
Project Description:
The section Spange Airfield Aspern represents a connection between junction Haidjöchl (as an extension of the city road Vienna A 23 coming from the Hirschstetten junction) and S 1 Vienna Außenring Schnellstraße (outer perimeter speedway) at the Raasdorf interchange.
Client: ASFiNAG Bau Management GmbH
Timeframe: 2006 to 2015
Construction Term: 2015 to 2017
Project Share WERNER CONSULT in consortium:
Preliminary project (road planning, cost/benefit study)
Permit application project (road planning, legal procedures, EIA environmental impact assessment)
Construction project (road planning)
Project Description:
As a traffic supplemental solution for S 1 Vienna Außenring Schnellstraße (outer perimeter speedway) between Vösendorf and Schwechat a bundle of local bypasses has been planned:
- Bypass Maria Lanzendorf
- Bypass Lanzendorf
- Bypass Rannersdorf
- Bypass Himberg
Client: Government of Lower Austria
Timeframe: 1990 - 2003
Construction Term: 2003 - 2010
Project Share WERNER CONSULT:
Studies (road planning, project control)
General project (road planning, project control)
Permit application project (road planning, project control, legal procedures, UVP)
Construction project (road planning)