• Deutsch
  • English
Werner Consult
  • Home
  • Company
    • About us
    • Management
    • Company structure
    • Quality
  • Services
  • Competencies
    • Railway design
    • Road design
    • Airport design
    • Structural Engineering
    • Hydraulic engineering
    • Construction Management Civil Eng.
    • Construction Management Building
  • Projects
    • Railway construction
    • Road construction
    • Airport construction
    • Garage construction
    • hydraulic engineering
    • Structural engineering
    • Bridgework engineering
  • News
  • Jobs
  • Portal
  • Contact

Road construction

S 36 Tanzenbergtunnel, Full Restoration

Project Description:
The Bruck tunnel chain underwent a full restoration after more than 18 years of use. The  Tanzenberg tunnel with 2.5 km length and 2 parallel pipes, as well as the central monitoring center Bruck have been upgraded to the newest level of technology.  This project was primarily focused on the ventilation system, the electric-mechanical equipment, the communication system, video monitoring equipment as well as the new operating station and rescue- and evacuation routes.

Client:
ASFiNAG Bau Management GmbH
Timeframe: 2007 - 2009
Construction Term: 2007 - 2009
Project Share WERNER CONSULT in consortium:
Support management during the planning- and tender phase

  • Click to enlarge image p-sb-s6-100-tanzenbergtunnel-lageplan.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/road-construction.html?start=10#sigProId8fd5eefcc5

S 36 Murtal Schnellstraße (speedway), Section Judenburg - St. Georgen ob Judenburg

Project Description:
As the final section, the gap closure of S 36 Murtal Schnellstraße (speedway)was planned in the area between Judenburg and St. Georgen o. J.

Client:
ASFiNAG Bau Management GmbH / Styria Provincial Government
Timeframe: 2005 - 2011          
Construction Term: open ended
Project Share WERNER CONSULT:
Route studies
Permit application project (road planning, bridges, legal procedures, UVP)

  • Click to enlarge image sb-s36-050-judenb-stgeorgen-karte-1-teil.jpg
  • Click to enlarge image sb-s36-080-judenb-stgeorgen-proj-2008-1-teil.jpg
  • Click to enlarge image sb-s36-100-ta1-grafik-falkenberg.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/road-construction.html?start=10#sigProIdc9ff08ed4b

S 8 Marchfeld Schnellstraße (speedway), Section S 1 – State Border

Project Description:
S 8 Marchfeld Schnellstraße (speedway) represents a high-ranking road connection running diagonally through the Marchfeld north of the Donau from Vienna in the area of S 1 Vienne Außenring Schnellstraße (outer perimeter speedway) and Slovakia north of Bratislava

Client:
ASFINAG Bau Management GmbH
Timeframe: 2007 - 2018
Construction Term: 2015 - 2018
Project Share WERNER CONSULT in consortium:
Project control (preliminary project, permit application project, construction project optional)

  • Click to enlarge image p-sb-s8-100-160613.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/road-construction.html?start=10#sigProId728ba308da

L 303 Predinger Straße, Restructuring of St. Andrä i.S. - Pistorf

Project Description:
L 303 was completely restructured on a 2.5 km long section coming from St. Andrä im Sausal, the, track support and super-structure has been replaced as well as the drainage system and entrances/exits have been adapted.

Client:
Styria Provincial Government
Timeframe: 2010           
Construction Term: 2011
Project Share WERNER CONSULT:
Construction project, road planning

  • Click to enlarge image sb-l303-standr-pistdorf-100-0158.jpg
  • Click to enlarge image sb-l303-standr-pistdorf-200-0172.jpg
  • Click to enlarge image sb-l303-standr-pistdorf-300-uek-25000.jpg
  • Click to enlarge image sb-l303-standr-pistdorf-400-0172.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/road-construction.html?start=10#sigProIdb863a33c74

L 303 Predinger Straße, Restructuring of Peterlhöhe - St. Andrä i. S.

Project Description:
L 303 was completely restructured at a 2.5 km long section coming from St. Andrä im Sausal, the, track support and super-structure has been replaced as well as the drainage system and entrances/exits have been adapted.

Client:
Styria Provincial Government
Timeframe: 2011 - 2012
Timeframe: 2012 - 2013
Project Share WERNER CONSULT:
Construction project (road planning, legal procedures)

  • Click to enlarge image sb-l303-peterlhoehe-100-uek-25000a.jpg
  • Click to enlarge image sb-l303-peterlhoehe-200.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/road-construction.html?start=10#sigProIdfd2fd4622c

  1. S 7 Fürstenfelder Schnellstraße (speedway)
Prev
1234
Next
Werner Consult Ziviltechniker GmbH | Leithastraße 10   1200 Wien Austria | Tel.: +43/1/31360-0 | Fax: +43/1/31360-090 | Diese E-Mail-Adresse ist vor Spambots geschützt! Zur Anzeige muss JavaScript eingeschaltet sein! |
  • Imprint

©2021 WERNER CONSULT