Project Description:
Four story parking garage at the Vienna Prater. Metal curtain facade. Three story office building with approx. 1.800 sqm gross floor surface. Newly developed exterior facilities and entrances.
Client: Pratergaragen ErrichtungsgmbH
Timeframe: Project in planning stage
Parking spaces: 370 motor vehicles and 37 bicycle spaces
Project Share WERNER CONSULT: General planning, local site supervision, project control
Project Description:
Construction of an underground parking garage under difficult circumstances (sub-way, ventilation structures, basement installations, Donnerbrunnen) and restoring the prominent plaza.
Client: Tiefgarage Neuer Markt ErrichtungsgmbH
Timeframe: Project in planning stage
Parking spaces: 340 motor vehicles
Project Share WERNER CONSULT: General planning, local site supervision, project control
Project Description:
Parking garage with approx. 1,500 parking spaces and two entrance and exit options. It will be built with two circular ramps and a centrally located stairwell with two elevators.
Client: Vienna Airport AG
Timeframe: 2005-2006
Parking spaces: approx.. 1500 motor vehicles
Project Share WERNER CONSULT: supporting control
Project Description:
Park & Ride facility with six parking levels. Special amenities (motor vehicle service area on the first floor and a fitness center on the top floor). Access via the newly constructed Vienna River bridge incl. expansion of the river cross-section in the vicinity of the new bridge. Complete restoration of the existing ramp bridge.
Connecting bridge with moving walkway to the public transportation network (subway, suburban speed railway and busses). Newly designed parking deck court.
Client: BIP Garagengesellschaft
Timeframe: 2003-2008
Parking spaces: 1284 motor vehicles
Project Share WERNER CONSULT: General planning, project control, local site supervision, environmental compatibility study-declaratory application, assessment engineer in accordance with the Vienna Construction Act, construction site coordination pursuant of BauKG (Construction Coordination Act).
Project Description:
Five story Park & Ride facility with direct access to the Wr. Neustadt train station via a passenger tunnel, net curtain façade combined with a glass façade.
Client: ÖBB Infrastruktur Bau AG
Timeframe: 2007 - 2011
Construction Term: 2008 - 2009
Parking spaces: 875 motor vehicles and approx. 200 partially covered bicycle parking spaces
Project Share WERNER CONSULT: Feasibility study, general planning