Bridgework engineering

Salzburg, Railway Bridge Across Schwarzstraße

Project Description:
Within the framework of the short-distance traffic project a 4th track was added to the 3 existing tracks and the sub-structure was expanded (ductile piles) and retrofitted (carbon bands) on both sides. The 4 new support structures are WIB (sectional girders in concrete)- support structures, which have been partially inserted.

Client:
ÖBB Infrastructure AG
Timeframe: 2002 - 2008
Construction Term: 2006 - 2010
Project Share WERNER CONSULT (in consortium):
Tender preparation, construction phase planning, project details