Bridgework engineering

Salzburg Central Railway Station, Track Structures 1 to 4

Project Description:
Within the framework of restructuring the Central Railway Station in Salzburg, the track support structures 1 to 4 have been newly constructed including additional frame bridges. The static-constructive planning measures included all service provisions ranging from the preliminary project up to the detailed project. Each bridge support structure contains up to 3 tracks per structure. A total of 4 bridge support structures indifferent lengths run parallel to each other. The project was implemented as an integral reinforced concrete bridge.

Client: ÖBB Infrastructure AG
Timeframe: 2002 - 2011
Construction Term: 2010 - 2012
Project Share WERNER CONSULT:
Preliminary project, primary project, preparation of tender documents, project details