• Deutsch
  • English
Werner Consult
  • Home
  • Company
    • About us
    • Management
    • Company structure
    • Quality
  • Services
  • Competencies
    • Railway design
    • Road design
    • Airport design
    • Structural Engineering
    • Hydraulic engineering
    • Construction Management Civil Eng.
    • Construction Management Building
  • Projects
    • Railway construction
    • Road construction
    • Airport construction
    • Garage construction
    • hydraulic engineering
    • Structural engineering
    • Bridgework engineering
  • News
  • Jobs
  • Portal
  • Contact

Airport construction

Airport Graz, Expansion

Project Description:
The existing passenger building underwent a generous expansion, which included the construction of a helicopter landing pad.

Client:
Airport Graz Betriebs GmbH
Timeframe: 2002 - 2004      
Construction Term: 2003 - 2005 
Max. Boomerang Length: 160 m
Boomerang Height above Standard:
16 m
Max. Roof Support Width: 26 m
Project Share WERNER CONSULT: General planning in consortium with Pittino & Ortner Architektutbüro, static and construction, tender.

  • Click to enlarge image fb-graz-erw-100-P1010091.jpg
  • Click to enlarge image fb-graz-erw-200-P1010114.jpg
  • Click to enlarge image fb-graz-erw-300-p4140016.jpg
  • Click to enlarge image fb-graz-erw-400-pB160015.jpg
  • Click to enlarge image fb-graz-erw-500-P3030033.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/airport-construction.html?start=10#sigProId5a28dc4523

Airport Graz, Apron North-East Expansion

Project Description:
Expansion of apron areas for code "D" and "E".

Client:
Airport Graz Betriebs GmbH
Timeframe: 2000 - 2001           
Construction Term: 2001
Apron Dimensions: 42,000 m²
Project Share WERNER CONSULT: General planning, local construction supervision

  • Click to enlarge image fb-graz-vorfeld-100.jpg
  • Click to enlarge image fb-graz-vorfeld-200-p7180008.jpg
  • Click to enlarge image fb-graz-vorfeld-300-p7180009.jpg
  • Click to enlarge image fb-graz-vorfeld-400-p7180020.jpg
  • Click to enlarge image fb-graz-vorfeld-500-lageplan.jpg
  • Click to enlarge image fb-graz-vorfeld-550-betriebsstr.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/airport-construction.html?start=10#sigProId3c7d080183

Airbase Brumovski Langenlebarn, Military Facility, General Restoration Hangar Aprons

Client: Heeresgebäudeverwaltung Ost (Armed Forces Building Administration, East)
Timeframe: 2005 - 2010
Construction Term: 2006 - 2009
Helicopter Parking: 10
Apron Dimension: 52.000 m²
Project Share WERNER CONSULT: Planning and tender of all construction tasks as well as the markings and ground lighting, planning coordination and construction site coordination pursuant of BauKG (Construction Coordination Act)

  • Click to enlarge image fb-langenlebarn-100.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/airport-construction.html?start=10#sigProIda4390178aa

Airport Linz, Apron C130

Project Description:
After the Austrian Army acquired the military transport aircraft C-130 Hercules the apron in the area of 1+2 had to be expanded.

Client:
Heeresbauverwaltung West (Armed Forces Planning Department West)
Timeframe: 2002           
Construction Term: 2003
Apron Dimension: approx. 18,500 m²
Project Share WERNER CONSULT: General planning

  • Click to enlarge image fb-linz-100-vorfelderw-img-0133.jpg
  • Click to enlarge image fb-linz-150-vorfelderw-img-0132.jpg
  • Click to enlarge image fb-linz-200-vorfelderw-img-0507.jpg
  • Click to enlarge image fb-linz-300-vorfelderw-img-0507 1.jpg
  • Click to enlarge image fb-linz-400-vorfelderw-dsc00701.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/airport-construction.html?start=10#sigProId8cd67be620

Airport Vienna, Apron Expansion North East Phase 1A and 1B

Project Description:
Expansion of apron areas and the taxiway system.

Client:
Airport Vienna AG
Timeframe: 2004 - 2006           
Construction Term: 2004 - 2005
Total Dimension: 220.000 m²
(New construction: approx. 160.000 m², restoration: approx. 34.000 m², parking lot C approx. 25.000 m²)
Drainage System:
approx. 1 km

Project Share WERNER CONSULT:
Local site supervision, construction site coordination

  • Click to enlarge image fb-vie-veno-1a-100-cimg1676.jpg
  • Click to enlarge image fb-vie-veno-1a-200-007-4a.jpg
  • Click to enlarge image fb-vie-veno-1a-300-014-11a.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/projects/airport-construction.html?start=10#sigProId72980f4324

  1. Airport Vienna, 3rd Runway
  2. Airport Vienna, Forcourt Check-In 3
  3. Airport Tuzla, Study: Bosnia and Herzegovina
Prev
1234
Next
Werner Consult Ziviltechniker GmbH | Leithastraße 10   1200 Wien Austria | Tel.: +43/1/31360-0 | Fax: +43/1/31360-090 | Diese E-Mail-Adresse ist vor Spambots geschützt! Zur Anzeige muss JavaScript eingeschaltet sein! |
  • Imprint

©2021 WERNER CONSULT