Project Description:
Full restoration of the runway built in the seventies in order to increase the load-bearing capacity to accommodate the new aeronautical developments.
Client: Airport Vienna AG
Timeframe: 2011 - 2013
Construction Term: 2012 - 2013
Runway Length: 3600 m
Project Share WERNER CONSULT: General planning
Project Description:
The apron expansion North/East phase 2 had to be implemented in order to optimally integrate the terminal 3 check-in into all apron areas.
Client: Airport Vienna AG
Timeframe: 2004 - 2011
Construction Term: 2005 - 2009
Overall Dimension: > 610.000 m²
De-icing Station: > 40.500 m²
Parking Spaces: 191 cars, 23 buses, 3 truck docking stations, aircraft positions: 21
Project Share WERNER CONSULT: General planning, planning coordination pursuant of BauKG (Construction Coordination Act)
Project Description:
Construction of a new high-speed taxiway and a new taxiway to access existing aircraft parking areas.
Client: Airport Graz Betriebs GmbH
Timeframe: 2009 - 2012
Construction Term: 2012 - ongoing.
Taxiway Dimensions: 13.000 m²
Apron Dimensions: 17.000 m²
Project Share WERNER CONSULT: General planning; tender, project management, planning- and construction site coordination pursuant of BauKG (Construction Coordination Act).
Project Description:
Preparatory measures to accommodate the Austrian Armed Forces Eurofighters
Client: Heeresbauverwaltung Süd (Armed Forces Planning Department, South)
Timeframe: 2005 - 2010
Construction Term: 2006 - 2010
Dimension: 310,000 m²
Runway Length: 2,750 m²
Project Share WERNER CONSULT: General planning (incl. tender, proposal assessment)
Project Description:
Renewal of canalization in the runway system 16/34.
Client: Airport Vienna AG
Timeframe: 2000 - 2008
Construction Term: 2002 - 2005
Canal: approx. 25.000 lfm (running meters)
Sealed Surface: 400 ha (hectare)
Basins, pump stations etc.
Project Share WERNER CONSULT (in consortium): General planning (variance analysis up to detail planning), tender for the runway system canal project 16/34, static-constructive work on the retention basins, pump stations etc.