• Deutsch
  • English
Werner Consult
  • Home
  • Company
    • About us
    • Management
    • Company structure
    • Quality
  • Services
  • Competencies
    • Railway design
    • Road design
    • Airport design
    • Structural Engineering
    • Hydraulic engineering
    • Construction Management Civil Eng.
    • Construction Management Building
  • Projects
    • Railway construction
    • Road construction
    • Airport construction
    • Garage construction
    • hydraulic engineering
    • Structural engineering
    • Bridgework engineering
  • News
  • Jobs
  • Portal
  • Contact

WERNER CONSULT at the 8th Lower Austrian-Water Biathlon

June 7, 2017

Just like in the past seven years, the WERNER CONSULT Hydraulic Engineering Department was present with four teams this year as well. The event was organized by the water group of the Lower Austrian State Government, and took place at the nuclear power plant Zwentendorf at mouth of the Traisen River into the Danube River. The water biathlon consists of the boating and running team competition. 57 teams were present at the starting line.

The WERNER CONSULT team “Godziller“ scored rank 4 in the overall ranking with strong rowing skills and excellent run times, the WERNER CONSULT women’s team “Drachenboot“ was able to place 1st in the women’s team competition.

  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-100-015.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-105-016.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-110-009.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-115-img-154255.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-118-022.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-120-img-152918.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-123-019.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-125-img-153018.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-130-023.jpg
  • Click to enlarge image akt-2017-06-02-noe-wasserbiathlon-135-025.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/news.html?start=10#sigProId26b7df5ccc

WERNER CONSULT Group represented in Munich now as well

May 15, 2017

Effective May 15, 2017 the WERNER CONSULT Group has added another company. The WERNER CONSULT Group has gained a small, well established engineering firm with extensive Tradition, the WINDERL INGENIEURE GmbH, headquartered in Munich. The first contact with the office of Manfred Winderl has been established several years ago already. Within the scope of cooperating in several projects the collaboration was strengthened and the decision to collaborate in the future was then made.  For approx. the past 5 years WERNER CONSULT has become increasingly active on the German market and has enjoyed a consistent growth rate. The hydraulic division set the benchmark, infrastructure projects (railway, airport, as well as road and bridge construction) followed. Currently, WERNER CONSULT is represented in in all engineering fields in Germany.

  • Click to enlarge image Werner-Consult-in-Muenchen.jpg
  • Click to enlarge image Winderl-Ingenieure-Logo.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/news.html?start=10#sigProId33761d154f

WERNER CONSULT at the Vienna-Marathon 2017

April 23, 2017

The 34th edition of the Vienna City Marathon took place under frigid and very windy conditions. 42,000 runners registered, more than 10,000 thereof, for the full Marathon of 42 kilometers. The WERNER CONSULT participated in the full Marathon with two mixed relays and two single runners, as well as one runner at the half marathon. The fastest WERNER CONSULT runner at the Marathon over the entire distance was Georg Zuschnig with the respectable time of 3:24:42.

  • Click to enlarge image akt-2017-04-27-100-marathon-start.jpg
  • Click to enlarge image akt-2017-04-27-104-marathon-img-1211.jpg
  • Click to enlarge image akt-2017-04-27-108-marathon-img-4229.JPG
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/news.html?start=10#sigProIdb9cc8458c3

2nd WERNER CONSULT Bowling-Tournament

March 27, 2017

The 2nd WERNERCONSULT-bowling tournament took place at the Phoenix Bowling Park Hernals on March 27, 2017.

Just as in the first tournament, the game was played in teams of four after the draw. After a warm-up period of 10 minutes, some trial bowls and warming up, all eight teams started the first game, which also represented the first quarter. The teams always bowled collaboratively in one lane. The mode was designed for each bowler (M/F) bowling one game for 10 frames (rounds). The sum of the individual score represented the effective team score. The four best teams continued to bowl in the second half. The eliminated teams continued to bowl outside of the official score board.

During the award ceremony, in addition to the three best teams, the best three individual bowlers where presented a trophy. 27. März 2017

  • Click to enlarge image akt-2017-03-27-bowling-100-P3274490.JPG
  • Click to enlarge image akt-2017-03-27-bowling-102-P3274501.JPG
  • Click to enlarge image akt-2017-03-27-bowling-104-P3274502.JPG
  • Click to enlarge image akt-2017-03-27-bowling-105-P3274503.JPG
  • Click to enlarge image akt-2017-03-27-bowling-106-P3274505.JPG
  • Click to enlarge image akt-2017-03-27-bowling-108-P3274508.JPG
  • Click to enlarge image akt-2017-03-27-bowling-110-P3274509.JPG
  • Click to enlarge image akt-2017-03-27-bowling-200-P3274512.JPG
  • Click to enlarge image akt-2017-03-27-bowling-202-P3274514.JPG
  • Click to enlarge image akt-2017-03-27-bowling-204-P3274520.JPG
  • Click to enlarge image akt-2017-03-27-bowling-206-P3274535.JPG
  • Click to enlarge image akt-2017-03-27-bowling-208-P3274538.JPG
  • Click to enlarge image akt-2017-03-27-bowling-300-P3274545.JPG
  • Click to enlarge image akt-2017-03-27-bowling-302-P3274547.JPG
  • Click to enlarge image akt-2017-03-27-bowling-304-P3274549.JPG
  • Click to enlarge image akt-2017-03-27-bowling-306-P3274550.JPG
  • Click to enlarge image akt-2017-03-27-bowling-308-P3274551.JPG
  • Click to enlarge image akt-2017-03-27-bowling-310-P3274552.JPG
  • Click to enlarge image akt-2017-03-27-bowling-312-P3274555.JPG
  • Click to enlarge image akt-2017-03-27-bowling-314-P3274556.JPG
  • Click to enlarge image akt-2017-03-27-bowling-316-P3274558.JPG
  • Click to enlarge image akt-2017-03-27-bowling-318-P3274559.JPG
  • Click to enlarge image akt-2017-03-27-bowling-320-P3274562.JPG
  • Click to enlarge image akt-2017-03-27-bowling-322-P3274563.JPG
  • Click to enlarge image akt-2017-03-27-bowling-324-P3274565.JPG
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/news.html?start=10#sigProIdfe01a4dab2

New Contract: On-Site Project Supervision for the Parliament Renovation in Vienna

January 2017

After multi-level selection procedures, the On-site Project Supervision for the overall renovation of the parliament building was awarded to Werner Consult ZiviltechnikergmbH/Wendl ZT GesmbH who will assist with all construction-related issues on the renovation project throughout the upcoming years.

On-site Supervision’s scope of responsibility ranges from construction monitoring and coordinating all companies involved in the project up to ensuring compliance with cost and quality requirements. On-site Supervision will also supervise all safety issues and overall logistics. Architect Georg Zuschnig, Executive Construction Management, Civil Engineering at Werner Consult stated: “We will ensure that the renovation project is implemented in a result-oriented and efficient manner. Our staff will set up their work stations directly at the construction site. “

  • Click to enlarge image akt-2017-01-parlament-100-P1010802.jpg
  •  
View the embedded image gallery online at:
http://wernerconsult.at/index.php/en/news.html?start=10#sigProIdfc048affb1

  1. Grand Opening of the Cargo Center Vienna South
  2. WERNER CONSULT Graz Branch: Grand Opening Ceremony of our New Location
  3. WERNER CONSULT Attended the Career- and Informational Day (BIT-BAU) 2016
  4. Reconstruction, Railway Station Lustenau – Cross Feed of Support Structure in the Track 5 Section
Prev
12345678910
Next
  • News Archive
Werner Consult Ziviltechniker GmbH | Leithastraße 10   1200 Wien Austria | Tel.: +43/1/31360-0 | Fax: +43/1/31360-090 | Diese E-Mail-Adresse ist vor Spambots geschützt! Zur Anzeige muss JavaScript eingeschaltet sein! |
  • Imprint

©2021 WERNER CONSULT