S 1 Vienna Außenring Schnellstraße, Section Vösendorf - Schwechat

Project Description:
The S 1 Vienna Außenring Schnellstraße (outer perimeter speedway) connects A 2 at Vösendorf with A 4 at Schwechat. It was the first large project to be planned in accordance with the Environmental Impact Assessment Act. The road features two times two lanes with shoulders and currently has a capacity of approx. 70.000 motor vehicles/24 hrs.

Client:
ASFiNAG Bau Management GmbH
Timeframe: 1990 - 2006         
Construction Term: 2002 - 2006
Project Share WERNER CONSULT:
Preliminary project (road planning, project control)
General Project (road planning, project control)
Permit application project (road planning, project control object planning, legal procedures, UVP)
construction project (road planning, project control)